We’re so close to getting the schematic first floor plan finished. I’m hoping Rebecca doesn’t disown me by the time this is all said and done. I’ve changed my mind and contradicted myself a thousand times since we started. She’s incredibly patient!
Last week she sent me the scheme 2 she had been working on. I told her I was secretly hoping that I wouldn’t like it, making my decision easier. But unfortunately I liked it A LOT. Check out the image of what she sent me here: FIRST FLOOR Scheme 2 version 1
I really like how different this scheme is. I like the placement of the stairs and having the kitchen at the front of the house with the master at the back. It is also cool that you walk in under the stairs and on the second floor there is a catwalk that overlooks and frames the kitchen and dining area below.
But when I spoke with David about the design, he didn’t think it would work well with the Passive House standards. There are still several concepts that I’m understanding as we go along, but with the Passive House, the exhaust is in the kitchen and bathrooms, so it’s best to have the kitchen and bathrooms towards the middle or back of the house. We’re creating passive solar heat gain on the south side of the house through the windows, so we want the exhaust to be further away from the front of the house so that we aren’t exhausting the energy before it has a chance to circulate throughout the whole house.
After David and I talked, Rebecca flipped the kitchen to the back of the house, bumped out a wall to add a few inches to the master bath/shower, and put pocket doors everywhere. With the latest version of this scheme, you can now access the laundry from the master closet, so my future roommate won’t have to watch me run naked across the house in search of clean clothes! 🙂 It’s been a touch decision, but I still think I prefer this design over scheme 1. There’s a little less closet space and a little more square footage in scheme 2, but I think the living space flows nicely, and again, I really like having the master at the back. We’ll have to use sound batts to buffer the noise from the kitchen in the master.
Here’s the latest version of scheme 2 with the kitchen at the back: Scheme 2 version 2
If you’d like to compare it to the latest version of scheme 1, here’s that image as well: FIRST FLOOR Scheme 1
I’d love to hear any thoughts you have! There a few small adjustments left to make, but we’re really close to finishing the first floor schematic, which I think is the toughest part of any design.