Plan Progress

Rebecca and I have worked hard over the last several weeks on the development of the house design, staring at plans, piecing things together. She’s done an awesome job of showing me different design options while still incorporating all of my ideas!

We wanted to get the first floor finished before we worked anymore on the upstairs or exterior. We’ve gotten one scheme mostly finished, and I really like how it has evolved. Rebecca’s currently designing a second scheme just to make sure we come up with the best of all possible worlds. You can click on the link here to see the most up to date version of scheme 1: FIRST FLOOR_Vs 1.b_120511

With this scheme, a porch runs the length of the house across the front. You walk in to the two story great room that opens to a loft above. The stairs are open, so you can walk underneath them into the vestibule to access the powder bath or master bedroom. The powder bath can be accessed from the master bath, which saves on space and plumbing fixtures! We made some other changes to the master bath and closet area that I’m really happy with. I initially wanted to incorporate two master closets, but it was difficult to squeeze two doors in. With this design, there is a small dividing wall that creates 2 separate areas with only one door. That also allowed us to fit in a small linen closet. I also like being able to see the shower as you walk into the bath. That makes for an opportunity to do some cool tile detail.

The master closet opens to the laundry area. The laundry is a little bigger than what I need, but it is nice to be able to access it from the master.

For the kitchen, we tried a few different layouts, but so far I like this one the best. It creates a very linear, modern feel and keeps the kitchen at the center of things without breaking up or closing off the space. We’re talking about doing a refrigerator with a cabinet face on the wall behind the stairs, which I think would look really awesome.

The dining room is at the back of the house with a door opening to the backyard. On the back side of the laundry room is a flex room that I’ll probably use as an office/ TV room, but it’s also big enough to serve as a nursery or small bedroom in case someone were to stay with me that couldn’t go upstairs. Part of green building is creating spaces that can provide for a variety of needs and situations, which means they’re more likely to be functional long term without having to remodel or rebuild.

So far, we haven’t cut down on the square footage. I feel like there’s a little more space than I need in the great room and kitchen, but design wise, it may work out best to leave them as they are. I want to cut down as much as possible on the square footage, but I also want to make sure that the house will work for me long term. So I’d rather be slightly over than cursing my lack of space in a year or two!

I’m still trying to decide whether to leave the master bedroom on the front of the house or flip it to the back, putting the office at the front of the house. It would be nice to have it at the back for privacy reasons, but it could also be nice to have the office back there. So many decisions! This drawing shows a two car detached garage. Because of the space needed for a turning radius and parking pad, it still takes up a big chunk of the backyard. I haven’t decided yet whether to leave a two car garage or to have a longer, narrow, one car garage that could have space for storage or a workshop at the back.

Before we get too far along, David and I are going to meet to make sure there’s not anything about this design that won’t work with Passive House standards.

I’ll keep you posted as things progress!

Leave a Reply